Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Ninh Kieu pedestrian bridge
Place Image
Place Image
Place Image
Place Image
Place Image
Place Image
Place Image
Place Image
Place Image
Place Image

Camera tour

Introdution

Price: Free

Phone: 02923 820 336

Time to visit a place: 120 minutes

Open Time: 4:00 AM - Close Time: 11:00 PM

Email: phongvhtttt_ninhkieu@cantho.gov.vn

Address: Tan An ward, Ninh Kieu County, Can Tho City

Ninh Kieu pedestrian bridge Inaugurated and used since February 6, 2016, Ninh Kieu pedestrian bridge attracted the attention ...  Inaugurated and used since February 6, 2016, Ninh Kieu pedestrian bridge has attracted the attention of residents and visitors.The pedestrian bridge was put into operation on the occasion of the Lunar New Year and received positive feedback from the people and visitors. It is estimated that every day, more than 5,000 visitors come to visit and enjoy walking, crossing the bridge, taking souvenir photos in the shimmering lights as well as enjoying the cool breeze from the Hau river. This is the first pedestrian bridge in the Mekong Delta (Mekong Delta) built modernly by semi-permanent reinforced concrete with a cost of VND 49.6 billion. The bridge is 199 meters long, 7.2 meters wide, S-shaped curving. The bridge has two extensions built with two lotus stations and sheltered foot rests with lighting systems using the color-led script. Use solar energy. The work is a highlight of the landscape between the city, a new tourism product to serve the walking needs of the local people, attracting domestic and foreign tourists to contribute to the premise of making Can Tho city more and more develope.  My Trinh View more

Map

Introdution

×

Ninh Kieu pedestrian bridge

Inaugurated and used since February 6, 2016, Ninh Kieu pedestrian bridge attracted the attention ... 

20160629_151057

Inaugurated and used since February 6, 2016, Ninh Kieu pedestrian bridge has attracted the attention of residents and visitors.The pedestrian bridge was put into operation on the occasion of the Lunar New Year and received positive feedback from the people and visitors. It is estimated that every day, more than 5,000 visitors come to visit and enjoy walking, crossing the bridge, taking souvenir photos in the shimmering lights as well as enjoying the cool breeze from the Hau river.

This is the first pedestrian bridge in the Mekong Delta (Mekong Delta) built modernly by semi-permanent reinforced concrete with a cost of VND 49.6 billion. The bridge is 199 meters long, 7.2 meters wide, S-shaped curving. The bridge has two extensions built with two lotus stations and sheltered foot rests with lighting systems using the color-led script. Use solar energy.

Copy Ninh Kieu - Copy

The work is a highlight of the landscape between the city, a new tourism product to serve the walking needs of the local people, attracting domestic and foreign tourists to contribute to the premise of making Can Tho city more and more develope.

 My Trinh

Review and Evaluation


Alls
(From total review)

Sample Plan

Accommodations